FAA Increasing Oversight of Boeing Production and Manufacturing
After taking decisive and immediate action to ground approximately 171 Boeing 737-9 MAX planes, the Federal Aviation Administration (FAA) on Jan. 12 announced new and significant actions to immediately increase its oversight of Boeing production and manufacturing. These actions come one day after the FAA formally notified Boeing that the FAA has launched an investigation into the company as a result of last Friday’s incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. The actions announced Jan. 12 include the FAA conducting: "It is time to re-examine the delegation of authority and assess any associated safety risks," FAA Administrator Mike Whitaker said. "The grounding of the 737-9 and the multiple production-related issues identified in recent years require us to look at every option to reduce risk. The FAA is exploring the use of an independent third party to oversee Boeing’s inspections and its quality system." Yesterday, the FAA announced an investigation to determine if Boeing failed to ensure completed products conformed to its approved design and were in a condition for safe operation in compliance with FAA regulations. The letter to Boeing is available here. The safety of the flying public, not speed, will determine the timeline for returning the Boeing 737-9 MAX to service. See the FAA's statements on the grounding of certain Boeing 737-9 MAX aircraft here.